Skip to main content

Series 5: Hydroelectric Development Project, 1972-1986

 Series

Detailed List of Contents

Series 5: Hydroelectric Development Project

Series contains documents pertaining to the Hydroelectric Development Project at the Winter Dam. Included are various studies performed to determine the feasibility of generating electricity with the dam, construction plans and agreements between NSP and the Lac Courte Oreilles in regard to the project.

Box 3 Folder 12: LCO Hydroelectric Development Project, 1983-1984
Box 3 Folder 20: Power Sale Contract Drafts, 1982-1983
Box 6 Folder 11: Invitation to Fund LCO Hydroelectric Project, circa 1983
Box 6 Folder 12: Chippewa Reservoir Hydroelectric Development Feasibility Study, May 5, 1982
Box 6 Folder 13: Mead and Hunt Engineering Project Qualifications, circa 1982
Box 6 Folder 14: US Department of Energy Financing of Small Hydroelectric Projects, 1981
Box 6 Folder 15: LOC and NSP Joint Application for Hydroelectric License Exemption, 1984
Box 6 Folder 16: Hydrologic Study Draft – Chippewa Flowage Project, August 1, 1972
Box 6 Folder 17: Hydrologic Study – Chippewa Flowage Project and Hydro plant blueprint, July 1973
Box 7 Folder 10: Hydroelectric Development Studies, 1976-1984
Box 7 Folder 18: Development of LCO Power Project, 1986

Dates

  • Creation: 1972-1986

Creator

Access Restrictions

Collection is open to the public.

Extent

0.5 Linear Feet (1 record carton)

Language of Materials

From the Collection: English

Repository Details

Part of the Special Collections and Archives, McIntyre Library, UW-Eau Claire Repository

Contact:
Special Collections and Archives, McIntyre Library
University of Wisconsin-Eau Claire
103 Garfield Avenue
Eau Claire WI 54701 United States
715-836-2739